7 common mistakes in a factory relocation

The mistakes that cost the most in a factory relocation: starting late, no floor plan, last-minute technicians, and moving everything at once.

Illustration: 7 common mistakes in a factory relocation LINE-2 / M-04

In short

Most problems in a factory move come from late planning: no floor plan for the new building, power not ready, technicians not booked, and trying to move everything at once. A phased plan and one owner prevent most of the damage.

The mistakes

  • Starting to plan a month ahead; a factory needs two to three months.
  • No floor plan for the new building, so positions are decided while unloading.
  • Power and data not ready when the equipment arrives.
  • Technicians booked at the last minute and arriving late.
  • Moving the whole factory at once instead of in phases.
  • Not selling or disposing of old equipment first, and paying to move it.
  • No single owner on site to make decisions.

Doing it right

Start with a survey, build a floor plan, book electricians and technicians with dates, and move in phases: warehouse and offices first, and what production depends on last. One project manager on the mover's side and one owner on the factory's side.