In short
Most problems in a factory move come from late planning: no floor plan for the new building, power not ready, technicians not booked, and trying to move everything at once. A phased plan and one owner prevent most of the damage.
The mistakes
- Starting to plan a month ahead; a factory needs two to three months.
- No floor plan for the new building, so positions are decided while unloading.
- Power and data not ready when the equipment arrives.
- Technicians booked at the last minute and arriving late.
- Moving the whole factory at once instead of in phases.
- Not selling or disposing of old equipment first, and paying to move it.
- No single owner on site to make decisions.
Doing it right
Start with a survey, build a floor plan, book electricians and technicians with dates, and move in phases: warehouse and offices first, and what production depends on last. One project manager on the mover's side and one owner on the factory's side.
More about factory relocation
- Factory relocation: what to check in the new building before signingBefore signing for a new factory building: truck and crane access, gates and height, floor load, power and compressed air, permits and a layout plan. The checks that prevent costly surprises on moving day.
- Factory relocation timeline: from 3 months before to start-up dayA factory relocation timeline: 3 months before, a month before and moving week, how to limit downtime, who disconnects the equipment and what to check at start-up.
More guides
- How much does a factory relocation cost?What drives the cost of a factory relocation: amount and weight of equipment, lifting equipment, distance, phased work and night shifts, and how to get an accurate quote.
- Factory relocation timeline: from 3 months before to start-up dayA factory relocation timeline: 3 months before, a month before and moving week, how to limit downtime, who disconnects the equipment and what to check at start-up.
- Factory relocation: what to check in the new building before signingBefore signing for a new factory building: truck and crane access, gates and height, floor load, power and compressed air, permits and a layout plan. The checks that prevent costly surprises on moving day.
Need help with this?
We do factory relocation from start to finish. Request a quote.