In short
There is no fixed price for a factory relocation. Cost depends on the number and weight of machines, the need for cranes and forklifts, distance, the number of phases and working hours. An accurate price comes from a site survey and a detailed, phased quote.
What affects the price
- Number, weight and size of machines.
- Lifting equipment: forklifts, heavy skates or a crane.
- Access: floors, ramps, openings and truck parking.
- Distance between buildings.
- Phased, night or weekend work.
How to save
- Sell or dispose of equipment that is not moving before the move.
- Prepare an equipment list and a floor plan for the new building.
- Appoint one decision-maker on site.
- Book electricians and technicians in advance so nobody waits.
What to ask for in a quote
- A breakdown by phase and equipment type.
- What is included: lifting gear, packing, disassembly and reassembly.
- Insurance details and cover.
- Schedule and who manages the project.
More guides
- 7 common mistakes in a factory relocationThe mistakes that cost the most in a factory relocation: starting late, no floor plan, last-minute technicians, and moving everything at once.
- Factory relocation timeline: from 3 months before to start-up dayA factory relocation timeline: 3 months before, a month before and moving week, how to limit downtime, who disconnects machines and what to check at start-up.
- Factory relocation: what to check in the new building before signingBefore signing for a new factory building: truck and crane access, gates and height, floor load, power and compressed air, permits and a layout plan. The checks that prevent costly surprises on moving day.
- Moving a small factory or workshop: how to plan the moveHow to move a small factory, joinery, metal shop or print shop: a machine list, a layout plan, preparing machines for transport, moving in stages, and what the factory's electrician and technicians do.
Need help with this?
We do factory relocation from start to finish. Request a quote.