Factory relocation

When a factory moves, every day of downtime costs money. We build a phased plan: what moves first, what keeps producing until the last moment, and how the line comes back up in the new building. We bring crews, trucks, forklifts and cranes, with one project manager responsible for everything.

Approach
phased
Lifting
forklifts, cranes
Management
one PM
Forklift lifting a production machine on a pallet during a factory move LINE-2 / M-04

What we move

  • Production machines and assembly lines
  • Lifting machines by crane and forklift
  • CNC machines, lathes and mills
  • Compressors, generators and electrical cabinets
  • Racking and warehouse systems
  • Packaging equipment and conveyors
  • Factory offices and server room

Our process

  1. 01Factory survey

    We map every machine, weight, lifting point and connection, and check the new building's floor, openings and truck access.

  2. 02Phased plan

    A sequence that keeps production running as long as possible, aligned with the plant's schedule.

  3. 03Dismantling and loading

    Labelled, documented disassembly, lifting by forklift or crane, and secure tie-down.

  4. 04Placement and reassembly

    Placement per the new floor plan, mechanical reassembly and connection by technicians, then the next item.

How to minimise production downtime

The key is not to move everything in one day. Start with the warehouse, offices and less critical lines, and leave the main machines for a weekend or holiday. The plant keeps supplying customers almost to the last moment.

Moving a logistics warehouse

In a warehouse the challenge is volume. We work by locations: every pallet is labelled for its destination rack, so the new warehouse is organised from day one.

What a factory relocation includes

Factory survey and phased planIncluded
Numbered machine list with weights and lifting pointsIncluded
Mechanical dismantling, labelling and packingIncluded
Forklifts, heavy-duty skates and transport dolliesIncluded
Trucks and secure tie-downIncluded
Dedicated project managerIncluded
Crane and crane truckAs needed
Weekend or holiday workAs needed
Disconnecting and connecting power, air and controlsThe plant's electricians and technicians
Levelling and calibrating machinesManufacturer / plant technician
Hazardous materials and wasteLicensed contractor

What changes with the type of plant

  • Machining and metalwork: heavy CNC machines, lathes and presses. Axes are locked per the manufacturer's instructions and the floor load in the new building is checked in advance.
  • Electronics and assembly: equipment that is sensitive to static and shocks. It is packed in anti-static packaging and moved in shock-absorbing trucks.
  • Production with a cleanroom: equipment going into a cleanroom is cleaned and double-wrapped, and after the move QA tests the room to its class. See Moving equipment into and out of a cleanroom.

Moving within an industrial zone or to another city

Within the same industrial zone the trucks make several runs a day, so a machine can be moved and placed on the same day. For a move to another city we plan full loads, an unloading order that follows the new floor plan and a crew waiting at the other end. We are based in Rehovot and relocate factories in the centre, the south and the north.

How to start

If you are just starting to plan, read our factory relocation timeline and what to check in the new building before signing. For a quote, send a list of machines with weights and photos, and we will get back to you with an initial plan.

Common questions about factory relocation

How long does a factory relocation take?

A small plant can move in a few days. A large plant moves in phases over several weeks. The schedule is set during the initial survey.

Do you provide cranes and forklifts?

Yes. All the lifting equipment needed is coordinated as part of the project.

Who connects the machines at the other end?

We handle placement and mechanical reassembly. Electrical, air and control connections are made by your own electricians and technicians.

How much does a factory relocation cost?

Price depends on the number and weight of machines, lifting equipment and distance. After a site survey we provide a detailed, phased quote.

Planning a move?

Tell us what needs to move and we'll get back to you with a plan and a quote.