What we move
- Factory offices and server room
- Warehouses, stock and racking
- QC and R&D labs
- Cleanroom equipment
- Electrical and network cabinets
- Safes and archives
We do not move industrial machines or CNC machines.
Our process
- 01Factory survey
We map the equipment that is moving, with weights and dimensions, and check the new building's openings, service elevators and truck access.
- 02Phased plan
A sequence that keeps production running as long as possible, aligned with the plant's schedule.
- 03Dismantling and loading
Labelled, documented disassembly, lifting by forklift or crane, and secure tie-down.
- 04Placement and reassembly
Placement per the new floor plan and reassembly of what was dismantled. Power and data connections are made by the plant's electricians and technicians.
How to minimise production downtime
The key is not to move everything in one day. Start with the warehouse, offices and less critical areas, and leave what production depends on for a weekend or holiday. The plant keeps supplying customers almost to the last moment.
Moving a logistics warehouse
In a warehouse the challenge is volume. We work by locations: every pallet is labelled for its destination rack, so the new warehouse is organised from day one.
What a factory relocation includes
| Factory survey and phased plan | Included |
|---|---|
| Numbered equipment list with weights and dimensions | Included |
| Dismantling, labelling and packing | Included |
| Forklifts, heavy-duty skates and transport dollies | Included |
| Trucks and secure tie-down | Included |
| Dedicated project manager | Included |
| Crane and crane truck | As needed |
| Weekend or holiday work | As needed |
| Disconnecting and connecting power and data | The plant's electricians and technicians |
| Hazardous materials and waste | Licensed contractor |
What changes with the type of plant
- Electronics and assembly: equipment that is sensitive to static and shocks. It is packed in anti-static packaging and moved in shock-absorbing trucks.
- Production with a cleanroom: equipment going into a cleanroom is cleaned and double-wrapped, and after the move QA tests the room to its class. See Moving equipment into and out of a cleanroom.
- Plants with a lab: freezers, fume hoods and lab equipment move as in any lab relocation: with a plan, suitable packing and the customer's technician for disconnection and connection.
Moving within an industrial zone or to another city
Within the same industrial zone the trucks make several runs a day, so a whole area can be dismantled, moved and placed on the same day. For a move to another city we plan full loads, an unloading order that follows the new floor plan and a crew waiting at the other end. We are based in Rehovot and relocate factories in the centre, the south and the north.
How to start
If you are just starting to plan, read our factory relocation timeline and what to check in the new building before signing. For a quote, send a list of equipment with weights and photos, and we will get back to you with an initial plan.
Common questions about factory relocation
How long does a factory relocation take?
A small plant can move in a few days. A large plant moves in phases over several weeks. The schedule is set during the initial survey.
Do you provide cranes and forklifts?
Yes. All the lifting equipment needed is coordinated as part of the project.
Who connects power and data at the other end?
Your own electricians and technicians. We place and reassemble what was dismantled, and fit our schedule to theirs.
How much does a factory relocation cost?
Price depends on the amount and weight of equipment, lifting equipment, the number of phases and distance. After a site survey we provide a detailed, phased quote.