Factory relocation

When a factory moves, every day of downtime costs money. We build a phased plan: what moves first and what keeps working until the last moment. We move the offices, warehouse and stock, labs, server room, electrical cabinets and safes. We bring crews, trucks, forklifts and cranes as needed, and one project manager is responsible for everything.

Approach
phased
Lifting
forklifts, cranes
Management
one PM
Forklift lifting an electrical cabinet on a pallet during a factory move HALL-2 / P-04

What we move

  • Factory offices and server room
  • Warehouses, stock and racking
  • QC and R&D labs
  • Cleanroom equipment
  • Electrical and network cabinets
  • Safes and archives

We do not move industrial machines or CNC machines.

Our process

  1. 01Factory survey

    We map the equipment that is moving, with weights and dimensions, and check the new building's openings, service elevators and truck access.

  2. 02Phased plan

    A sequence that keeps production running as long as possible, aligned with the plant's schedule.

  3. 03Dismantling and loading

    Labelled, documented disassembly, lifting by forklift or crane, and secure tie-down.

  4. 04Placement and reassembly

    Placement per the new floor plan and reassembly of what was dismantled. Power and data connections are made by the plant's electricians and technicians.

How to minimise production downtime

The key is not to move everything in one day. Start with the warehouse, offices and less critical areas, and leave what production depends on for a weekend or holiday. The plant keeps supplying customers almost to the last moment.

Moving a logistics warehouse

In a warehouse the challenge is volume. We work by locations: every pallet is labelled for its destination rack, so the new warehouse is organised from day one.

What a factory relocation includes

Factory survey and phased planIncluded
Numbered equipment list with weights and dimensionsIncluded
Dismantling, labelling and packingIncluded
Forklifts, heavy-duty skates and transport dolliesIncluded
Trucks and secure tie-downIncluded
Dedicated project managerIncluded
Crane and crane truckAs needed
Weekend or holiday workAs needed
Disconnecting and connecting power and dataThe plant's electricians and technicians
Hazardous materials and wasteLicensed contractor

What changes with the type of plant

  • Electronics and assembly: equipment that is sensitive to static and shocks. It is packed in anti-static packaging and moved in shock-absorbing trucks.
  • Production with a cleanroom: equipment going into a cleanroom is cleaned and double-wrapped, and after the move QA tests the room to its class. See Moving equipment into and out of a cleanroom.
  • Plants with a lab: freezers, fume hoods and lab equipment move as in any lab relocation: with a plan, suitable packing and the customer's technician for disconnection and connection.

Moving within an industrial zone or to another city

Within the same industrial zone the trucks make several runs a day, so a whole area can be dismantled, moved and placed on the same day. For a move to another city we plan full loads, an unloading order that follows the new floor plan and a crew waiting at the other end. We are based in Rehovot and relocate factories in the centre, the south and the north.

How to start

If you are just starting to plan, read our factory relocation timeline and what to check in the new building before signing. For a quote, send a list of equipment with weights and photos, and we will get back to you with an initial plan.

Common questions about factory relocation

How long does a factory relocation take?

A small plant can move in a few days. A large plant moves in phases over several weeks. The schedule is set during the initial survey.

Do you provide cranes and forklifts?

Yes. All the lifting equipment needed is coordinated as part of the project.

Who connects power and data at the other end?

Your own electricians and technicians. We place and reassemble what was dismantled, and fit our schedule to theirs.

How much does a factory relocation cost?

Price depends on the amount and weight of equipment, lifting equipment, the number of phases and distance. After a site survey we provide a detailed, phased quote.

Planning a move?

Tell us what needs to move and we'll get back to you with a plan and a quote.