In short
The key is that all preparation happens before the weekend: employees pack and label on Thursday, the crew dismantles and loads in the evening or on Friday, placement and reassembly are done by Saturday night, and IT connects so everything works on Sunday.
Sample timeline
- Thursday noon: employees finish packing and labelling.
- Thursday afternoon: furniture disassembly and computer packing.
- Friday: transport and placement by workstation.
- Saturday night or early Sunday: IT connects and tests.
What must be ready first
The new office must be ready: power, network points, air conditioning and keys. Check that the internet already works there before the weekend. If something is not ready, it is better to postpone a week than move into an office you cannot work in.
Who does what
- Moving company: disassembly, packing, transport and reassembly.
- IT: shut-down, connection and testing.
- Move owner: on-site decisions and checking against the plan.
Moving dozens of workstations?
Send us the number of workstations, both addresses and the new office plan on WhatsApp, and we will come back with a work plan and a quote.
Send on WhatsAppOffice moving by area
- Office moving in Tel Aviv and Ramat Gan
- Office moving in Herzliya Pituach
- Office moving in Petah Tikva and Rosh HaAyin
- Office moving in Rehovot and Ness Ziona
- Office moving in Modiin and Airport City
More guides
- Office move checklistA complete office move checklist: two months before, one month before, one week before, on moving day and on your first day in the new office.
- How much does an office move cost?What affects the cost of an office move: number of workstations, furniture disassembly, floors and elevators, working hours, server rooms and safes. How to get an accurate quote.
- A labelling system for office moves: every box at the right deskA simple labelling system for an office move: number rooms and workstations, colour-code labels by floor, label computers and cables, and sign the new office.
- Disassembling and reassembling workstations in an office moveHow to disassemble and reassemble workstations, sit-stand desks and partition walls in an office move without losing screws or delaying staff.
Need help with this?
We do office moving from start to finish. Request a quote.