In short
Equipment for a cleanroom is cleaned and double-wrapped outside, the outer layer comes off in the airlock, and crew members entering wear the required gowning. After the move, QA runs the tests the room's classification requires.
Keep particles out
In a cleanroom every cardboard box, wheel and garment sheds particles. Ordinary cardboard does not go in, and equipment arrives in two layers of clean film. The outer layer is removed at the entrance and the inner layer inside the room.
Plan with the cleanroom team
- Entry procedure, gowning and the number of people allowed.
- Airlock and door sizes, to know what fits in one piece.
- Clean carts used only inside the room.
After the move
Moving equipment and opening doors affects the room. QA runs the required tests before production or work resumes, so schedule them in advance. What the class means and when a room is tested again is explained in Cleanroom ISO classes.
More on cleanrooms
- Cleanroom ISO classes: how to read ISO 14644ISO 14644 cleanroom classes explained: particle limits for each class, the old Class 100 names, EU GMP grades A–D, and when a cleanroom has to be tested again.
- Portable cleanrooms: what they are and how to move onePortable and modular cleanrooms: softwall vs hardwall, which ISO class they reach, and how to move one within a building or relocate it to a new site.
- Moving a laminar flow cabinetHow to move a laminar flow cabinet (clean bench): protecting the HEPA filter, removing the stand, upright shock-free transport, and airflow and filter integrity testing before work resumes. Plus how it differs from a biosafety cabinet.
Lab moving by area
- Lab relocation in Rehovot, Ness Ziona and the Science Park
- Lab moving in Tel Aviv, Herzliya and Petah Tikva
- Lab and medical equipment moving in Jerusalem
- Lab and industrial moving in Haifa and the north
- Lab moving in Yokneam, Migdal HaEmek and the Galilee
- Lab moving in Beer Sheva and the south
- Lab and medical equipment moving in the Sharon
- Lab moving in Caesarea
- Sensitive equipment and industrial moving in Kiryat Gat and Ashkelon
More guides
- Lab relocation checklist: 15 steps before, during and afterA practical lab relocation checklist: appoint an owner, map equipment, handle chemicals and samples separately, and verify everything after the move.
- Moving an electron microscope: what to knowHow to relocate an electron microscope: work with the manufacturer's engineer, secure the column, move without vibration and prepare the new room.
- Moving an optical table without losing levelHow to move an optical table: remove components, lock the isolators, lift a heavy top, plan narrow openings and re-level at the new site.
- Insurance when moving expensive equipment: what to checkWhat to check about insurance before moving expensive equipment: coverage amount, exclusions, documentation before the move and how to report damage.
Need help with this?
We do laboratory relocation in Israel from start to finish. Request a quote.