In short
Beer Sheva and the south have a university with many research labs, a major medical centre, a hi-tech park and industrial zones. We move labs, medical equipment, freezers and biosafety cabinets to and from the area, arriving in the morning with every truck and crew member.
What is in the south
- Academic campuses with biology, chemistry and engineering research labs.
- A major medical centre and clinics in the area.
- A hi-tech park with R&D companies.
- Industrial zones in and around Beer Sheva.
What we move
- Complete labs between buildings and cities.
- Medical equipment and departments.
- -80°C freezers, incubators and biosafety cabinets.
- Servers and network equipment.
- Machines and heavy equipment, with a crane when needed.
Moving from the centre to the south
Many companies and labs move from the centre to Beer Sheva. On these moves the drive is planned so sensitive equipment leaves early and arrives early, and freezers with samples travel separately to keep their time without power short.
Heat and sensitive equipment
Summer temperatures in the south are very high. Heat-sensitive equipment moves in the morning, is never left in a closed truck, and is unloaded straight into an air-conditioned building.
Customer responsibilities
Gas disconnection and connection, instrument calibration and biosafety cabinet certification are done by the manufacturer's technician or the lab team, under the customer's responsibility. If needed, we are happy to refer you to a qualified technician we know.
More guides
- Lab relocation checklist: 15 steps before, during and afterA practical lab relocation checklist: appoint an owner, map equipment, handle chemicals and samples separately, and verify everything after the move.
- Moving an electron microscope: what to knowHow to relocate an electron microscope: work with the manufacturer's engineer, secure the column, move without vibration and prepare the new room.
- Moving an optical table without losing levelHow to move an optical table: remove components, lock the isolators, lift a heavy top, plan narrow openings and re-level at the new site.
- Moving equipment into and out of a cleanroomHow to move equipment into a cleanroom: clean and double-bag, enter through the airlock, gown the crew correctly and run classification tests after.
Need help with this?
We do laboratory relocation in israel from start to finish. See the service or request a quote.