In short
Before moving a server room, back everything up, document every connection, set the shut-down and start-up order, and make sure the new room is ready: power, cooling and connectivity. On moving day each server is packed anti-static and labelled by rack and unit.
Two weeks before
- Full backup, and a test that it restores.
- Document and photograph every rack and connection.
- Label every server and cable by rack and unit.
- Check the new room: power, UPS, cooling and connectivity.
Moving day
- Shut down in the order set by IT.
- Remove servers from racks and pack them anti-static.
- Move empty racks and place them per plan.
- Reinstall servers in the same units.
After
- Power up in order and check services.
- Check alerts and logs.
- Update documentation for the new location.
More about office and IT moves
- Office move IT checklist: computers, internet and phonesAn IT checklist for an office move: ordering internet and porting phone numbers, network points and Wi‑Fi in the new office, orderly backup and shutdown, labelling and packing computers and screens, and testing on the first morning.
- Moving a hi-tech company: offices, R&D lab and server room in one moveHow to move a hi-tech company: multi-monitor desks, electric desks, an R&D lab with test equipment and prototypes, and the server room with your IT team.
More guides
Need help with this?
We do server room relocation from start to finish. Request a quote.